HP Wynyard Data Centre
Client: Hewlett Packard
Project Details:
Connaught were proud to be selected to carry out the supply and installation of an extra heavy grade raised access floor to Data Halls 1-4 and the Comms Vend areas of the award winning HP Data Centre in Wynyard. The main installation of the raised floor was complete in ten weeks. The panels were air sealed and supplied with pre-bonded Sonae High Pressure Laminate.
The pedestal bases in the Data Halls were fixed to the mesh deck with special clip fixed metal bases and the pedestals were fixed with Bostik Serious Stuff and fixed twice with tex screws. All pedestals were nickel plated to prevent the formation of Zinc Whiskers.
The pedestal bases in the Comms and Vend areas were fixed to the sub floor with Apollo adhesive and all pedestals were nickel plated to prevent the formation of Zinc Whiskers.
On this project we also carried out the installation of two coats of PVA Sealer to the sub floor prior to the install of the raised flooring in the Comms / Vend areas. We supplied and installed heavy duty floor grilles to Data Halls and Comms Vend areas and formed ramps from the existing offices to the new mezzanine floor.
Attendance on Mechanical, Electrical and Data Cabling Services installations.
Awards: 2010 Green Enterprise IT Award in the Data Center Design.
Contract Duration: 3 months